Process
How a project runs.
Three phases, six steps, one contract. The people who take the first site measurement are the people who hand you the keys — which is why there is no gap here for a project to fall into.
Define
Everything is decided here, whether or not anyone admits it. We spend this phase proving the project works before it costs you anything to find out that it doesn't.
-
Site walk and brief
We start on the ground. Soils, drainage, setbacks, easements, and what the zoning will genuinely allow rather than what it appears to allow. Alongside that we get clear on what the building has to do for you and when you need it open.
Your partTell us the site, the program, and the date that matters.
-
Feasibility and budget
Before anyone draws a line, we test the numbers. Cost per square foot, utility capacity, flood exposure, and the schedule your pro forma depends on. If a project does not work, this is where you hear it — not in month eight with a slab already poured.
Your partShare the constraints you are actually working to.
Design
Architecture and engineering are drawn together, in the same room, from the first sketch. A detail that cannot be built is caught at the drawing board rather than on the morning the concrete arrives.
-
Concept and massing
Plans, sections and a three-dimensional model of the building on your site. Structure and mechanical systems are in the drawings from the beginning, so the concept you approve is one that can be built to the budget you agreed — not one that needs redrawing once an engineer sees it.
Your partReview it, mark it up, and tell us plainly what is wrong.
-
Construction documents
The full set — architectural, structural, mechanical and civil — produced in-house rather than coordinated across four firms. Materials are specified for Gulf Coast heat, humidity and storm exposure: chosen for how they weather here, not for how they render.
Your partOne consolidated round of comments before we seal the set.
Build
The same team that drew the building runs the site. One schedule, one point of accountability, and a finished space that matches what you approved.
-
Permitting and pre-construction
Permit applications, trade buyout and the construction schedule run in parallel rather than one after another. Long-lead items are ordered while the permit sits in review, which is where most projects quietly lose their first two months.
Your partSign off on the final scope and the agreed price.
-
Construction and handover
Weekly quality and safety audits with a named lead on site. At the end we walk the building against the drawings you approved, close out the punch list, and hand over the commissioning and warranty documentation in one place.
Your partWalk the building with us and list anything that is not right.
Next
Start with the site.
Most of what determines a project's cost is settled before the design begins. Send us the address and what you are trying to build, and we will tell you what the ground allows.